Ward 1 Specific Activities, 2008
Sheppard Sidewalk
• Urbanization which includes storm sewer installation, road reconstruction which includes new granular base materials, concrete curb & gutters, concrete sidewalk on the south side and base asphalt. Along with this project the Region of Durham will be replacing the existing watermain. Completion anticipated Nov 08.
Altona Road Widening (The Region of Durham)
• The Region anticipates starting construction for the widening of Altona Road from two (2) to four (4) lanes from Kingston Road to Stroud’s Lane in 2009. (see www.region.durham.on.ca);
Twyn Rivers & Altona Road (Honeywood Properties Inc.)
• Proposal for 10 detached dwellings situated at the south west corner of Altona Road and Twyn Rivers; The Ontario Municipal Board upheld Council’s approval of this development.
364 Kingston Rd. (NW corner at Rougemount)
• Proposal to add a variety of commercial uses to the existing zoning by-law in anticipation of future redevelopment of the property.
526 & 542 Kingston Road (east of Rosebank)
• The residential development of 30 townhouses and 15 detached dwellings is being finalized and construction anticipated this fall.
875 Kingston Road (Indopak Inc.)
• Council has approved a proposal for a 10 storey mixed use development consisting of 198 residential units and approximately 3500 square metres of commercial floor area; Site Plan being finalized with the City.
Fairport Rd/Spruce Hill Rd/Welrus St. (Anthony Debruin)
• Proposal for 27 single detached dwellings fronting onto a proposed municipal road; Council approved. Owners are fulfilling conditions of approval.
Rosebank Rd/Gillmoss (W&N Trapper, B Trapper/Land Pro Engineering)
• A Statutory Public Information Meeting was held on March 4, 2008, for a proposal to rezone and subdivide for 40 detached dwelling lots with frontages ranging from 11.0 to 13.0 metres; Applications are being reviewed. Report to Council anticipated by year end.
491 Rosebank Rd (Rosebank Properties Inc.)
• A Statutory Public Information Meeting was held on February 4, 2008 for a proposal to rezone and subdivide for 23 single detached dwelling lots with frontages ranging from 13.4 to 15.0 metres; Applications are being reviewed. Report to Council anticipated by year end.
Rosebank Sanitary Sewage Pumping Station
• The existing Rosebank Sanitary Sewage Pumping Station (SPS) requires upgrading to provide additional sanitary sewage pumping capacity and to comply with current engineering standards and health and safety regulations.
The Region is in the process of hiring the design consultant and as promised, a residents meeting will follow to provide the community opportunity for input into the design of the station. Anticipated late winter or spring of next year.
Contact Councillor Littley’s office if you wish to be notified of the residents meeting and haven’t already done so.
Tuesday, January 1, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment